Bridge to Nowhere
- Personal Fields 3D Work
The following project is a site specific sculpture built while studying at the Yestermorrow Design/Build School in summer 1992. The Bridge to Nowhere was completed in a single day in Warren, Vermont as part of a site-specific sculpture project (1992). The materials are 2×4 and other lumber left at a job site and airplane cable.