 |
 |
 |
UC MERCED SCIENCE + ENGINEERING LABORATORY
One of my responsiblities was to detail the zinc roof and zinc soffit system for the building. Extensive detailing was required to create a continuous flow of air beneath the zinc. And the detailing was further complicated by the addition of the internal gutter.
EHDD - 177,000 GSF - 2001 to 2003
|
 |