 |
 |
 |
UC MERCED SCIENCE + ENGINEERING LABORATORY
The ground floor plan shows the two bars with the loggia defining the two west-facing edges of the building along the plaza. There are 24 classlabs which are entered from the exterior with classlab support in the central spine of the building. The upper corner is for loading and other support services.
EHDD - 177,000 GSF - 2001 to 2003
|
 |