 |
 |
 |
BRIDGE TO NOWHERE
This was a design/build sculpture done with found materials. It was done in 2 days while spending a summer at the Yestermorrow Design/Build School in Warren, Vermont.
Built with scrap lumber and hung from trees with steel cable.
WARREN, VT - SUMMER 1993
|
 |